Hi all,
I'm digging the foundations for my new extension. The foundations are to be stepped by 225mm at the junction with the existing founds. When it comes to shuttering for the steps how is it done? What prevents the concrete running into the lower level?
TIA
Mark
I'm digging the foundations for my new extension. The foundations are to be stepped by 225mm at the junction with the existing founds. When it comes to shuttering for the steps how is it done? What prevents the concrete running into the lower level?
TIA
Mark