Can anyone help, I'm taking out a supporting wall to form an opening of 4500 I know how to do it, but its the calcs's that I can't do. The engineer said I would need to put goal posts in if I wanted to achieve a wider opening, how much of a bearer will I need at each end of the rsj if I was to go down that route.
Calc's for goal posts £700 and calc's for the brick piers £200, as you can see to use the steel method would be a lot more expensive just to gain a little less knib at each end. I also want to lift the rsj up into the ceiling and it will not carry any joists.
Will I need to underpin the piers at each end.
Thanks
Craig
[/img]
Calc's for goal posts £700 and calc's for the brick piers £200, as you can see to use the steel method would be a lot more expensive just to gain a little less knib at each end. I also want to lift the rsj up into the ceiling and it will not carry any joists.
Will I need to underpin the piers at each end.
Thanks
Craig
[/img]