Hi,

I've just poured the concrete slab floor base in my ground floor. I'll be putting 100mm insulation + UFH pipes + 75mm Screed on top of this.

There are a number of internal timber stud-partitions that I need to put up on the ground floor - Do i need to put these up before the insulation/screed?

Someone has said that the stud partitions need to go on top of the screed, but not sure how stable that will be as the screws will be going into the screed+ insulation unless i am using really large screws to get into the concrete slab base.
 
Sponsored Links
It can be either but logic would suggest laying the screed first. The screed will hold out for screwing into as long as you have left it say- a week.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top