I am going to be wall mounting my tv in my flat. the walls are all stud.
I have done the knock on the wall and marked with a pen.
The timbers are 60cm apart with hollow in between.
but then when you knock vertically up and down the timbers they also go hard and then hollow.
so therefor i seem to have hard squares that are 40cm apart vertically on each stud
Example image attached. Im a tad confused.
[/img]
I have done the knock on the wall and marked with a pen.
The timbers are 60cm apart with hollow in between.
but then when you knock vertically up and down the timbers they also go hard and then hollow.
so therefor i seem to have hard squares that are 40cm apart vertically on each stud
Example image attached. Im a tad confused.
[/img]