I currently in the progress and see build and I’m seeing lots of different ways of sub base/concrete floor etc could someone confirm if the below way is ok:
150mm Hardcore(Type 1)
20mm Blinding
DPM layer
100mm Celotex Insultaion
25mm PIR around the edges
100mm concrete
Thanks