Any of you guys got any suugestions for how I go about preparing the area prior to laying a compacted hardcore/mot sub base?
Basically I've got few edges of the new patio that will be 'free'. In other words not butted up to a wall or anything solid. Eventually some of these edges will have vertical slabs to create a neat edge (e.g. steps area).
But as I lay down the sub base, I don't want the type 1 to spill over the edges...
If I use timber then it would rot over time? So my idea of laying down some formwork like you would prior to concreting wouldn't be good?
What do you profs do in this situation?
Cheers
Ben
Basically I've got few edges of the new patio that will be 'free'. In other words not butted up to a wall or anything solid. Eventually some of these edges will have vertical slabs to create a neat edge (e.g. steps area).
But as I lay down the sub base, I don't want the type 1 to spill over the edges...
If I use timber then it would rot over time? So my idea of laying down some formwork like you would prior to concreting wouldn't be good?
What do you profs do in this situation?
Cheers
Ben