im going to run a submain.
i got the idea of running the main tails from the meter into a SP+N 100A switch fuse unit then submain tails from that upto the flat.
there are several flats in the building so is it best to fuse it with one of the units so the cable is not just reliant on the leccy boards fuse.
i have had a brief look at the current wiring in the basement "load centre" each flat is individually fed with a wylex switch fuse. ( im probably answering my own question with that comment)
so situation A = meter tails to 100A switch fuse unit then on to flat
Situation B = meter tails to 100A 60947-3 isolater switch reliant on main cut out fuse.
im probably just over thinking the whole thing
i got the idea of running the main tails from the meter into a SP+N 100A switch fuse unit then submain tails from that upto the flat.
there are several flats in the building so is it best to fuse it with one of the units so the cable is not just reliant on the leccy boards fuse.
i have had a brief look at the current wiring in the basement "load centre" each flat is individually fed with a wylex switch fuse. ( im probably answering my own question with that comment)
so situation A = meter tails to 100A switch fuse unit then on to flat
Situation B = meter tails to 100A 60947-3 isolater switch reliant on main cut out fuse.
im probably just over thinking the whole thing