Hi, i am new here, but have read hundreds of posts, i have started building a summerhouse/ garden room/shed, its 17 ft by 10ft, all the base is done and OSB boards down on the base, the frame work is up, now this is where i get stuck, i was going to put osb boards around the framework and then shiplap on top, then i changed my mind and decided not to put the osb boards on and just shiplap onto the frame work, i am now reading some more and i think i need to put a breathable membrane on it, now for my questions
1/ do i use a ply/osb board first is it necesary or can i go without
2/ if i don't use it how do i attach the breathable membrane to the framework
3/ then once the breathable membrane is in place do i attach batons??
im sorry for sounding thick this is the first build i have done and i would have got this far without this site, only i want it to be watertight, i have got some sliding double glazed patio doors to go in and i want the walls to be watertight, i would rather get it right first time thank you in advance
1/ do i use a ply/osb board first is it necesary or can i go without
2/ if i don't use it how do i attach the breathable membrane to the framework
3/ then once the breathable membrane is in place do i attach batons??
im sorry for sounding thick this is the first build i have done and i would have got this far without this site, only i want it to be watertight, i have got some sliding double glazed patio doors to go in and i want the walls to be watertight, i would rather get it right first time thank you in advance