sundial y plan

Joined
25 Jan 2008
Messages
1
Reaction score
0
Country
United Kingdom
can anyone help with the following:
can this plan be run by a single port(tempus one) controller.
the wiring at the controller is N-E-L IN LIVE LINK TO (1) boiler live and two feeds to the boiler area Hw and Ch. i have a wiring diagram which shows a hw off connection, i dont have a wire at the programmer to connect this. I assume a different method has been used???

I want to connect everything to a 10 way junction but without the hw off , i dont think it is possible.

thanks
red13
 
Sponsored Links
As y plan is designed to independently control ch and dhw, you need more than one signal. Why would you want to stick a tempus 1 on a 3port valve?
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top