I am part way through my first project part of which involves a small 2mx3m side extension with architects plans that say the depth of the foundations required are 1.1m. I have been away and returned to find that the foundations were dug and the builders had drilled a hole ready for the inspector to come and look at... The inspector has subsequently come round and stated that a depth of 2m is required as there is a Willow tree 20m away that may be an issue in the future.
I would be grateful for advice on:
1) Is there any options to overcome having to dig 2m?
2) If the builders have to dig 2m vs. 1.1 what would the cost differential typically be. i.e. Had a builder been quoting for 1.1m and then had to quote for 2m for a 2m x 3m space, what would the difference for the digging and concreting only be...
Total newbie would be grateful for any advice you can offer...
Many thanks,
J
I would be grateful for advice on:
1) Is there any options to overcome having to dig 2m?
2) If the builders have to dig 2m vs. 1.1 what would the cost differential typically be. i.e. Had a builder been quoting for 1.1m and then had to quote for 2m for a 2m x 3m space, what would the difference for the digging and concreting only be...
Total newbie would be grateful for any advice you can offer...
Many thanks,
J