- Joined
- 17 Mar 2016
- Messages
- 1
- Reaction score
- 0
- Country
Hi All
I'm about to put up a very small amount of plasterboard (tapered edge). Some onto studwork, others onto brick. I am wondering which of the following is the better way of filling the joint:
1) Fill joint, then add tape, then plaster over:
or
2) Tape, then plaster over:
Thanks for any comments.
I'm about to put up a very small amount of plasterboard (tapered edge). Some onto studwork, others onto brick. I am wondering which of the following is the better way of filling the joint:
1) Fill joint, then add tape, then plaster over:
2) Tape, then plaster over:
Thanks for any comments.