Literally the only place I can get new pipework out to one v. big rad in new ground floor extension is from the downstairs boiler room.
It's got a newish Brit Gas condensing boiler (with traditional hot and cold water tanks) and the original copper pipework goes off downstairs under the concrete and upstairs into the joists. One rad (no thermo valve – small downstairs cloakroom) tees straight off the big pipes in the boiler room.
I could tee off the cloakroom pipes or off the big pipes leading from boiler (presumably the downstairs flow/return).
Obviously I don't want to unbalance the way system works.
Any advice much appreciated.
It's got a newish Brit Gas condensing boiler (with traditional hot and cold water tanks) and the original copper pipework goes off downstairs under the concrete and upstairs into the joists. One rad (no thermo valve – small downstairs cloakroom) tees straight off the big pipes in the boiler room.
I could tee off the cloakroom pipes or off the big pipes leading from boiler (presumably the downstairs flow/return).
Obviously I don't want to unbalance the way system works.
Any advice much appreciated.