Hi folks,
I've been practicing me bending and soldering skills on bits of scrap pipe, and I'm feeling confident I can successfully connect up a toilet, basin, and shower to a new downstairs cloakroom/shower room (inclusion of shower depends on whether I can wedge one in, as it will be tight). In addition to this, 'er indoors wants a dishwasher plumbing in.
I'm happy enough cutting the water pipes just after the kitchen sink between it and the boiler, and soldering in a new run for the new shower room, along with a couple of connectors for a dishwasher.
I'm just wondering if you lot have any tips or things to watch out for. I've heard mentioned that you should try and tee into 22mm pipe from the main supply, however as soon as our supply comes into the house it reduces immediately to 15mm.
Thanks.
I've been practicing me bending and soldering skills on bits of scrap pipe, and I'm feeling confident I can successfully connect up a toilet, basin, and shower to a new downstairs cloakroom/shower room (inclusion of shower depends on whether I can wedge one in, as it will be tight). In addition to this, 'er indoors wants a dishwasher plumbing in.
I'm happy enough cutting the water pipes just after the kitchen sink between it and the boiler, and soldering in a new run for the new shower room, along with a couple of connectors for a dishwasher.
I'm just wondering if you lot have any tips or things to watch out for. I've heard mentioned that you should try and tee into 22mm pipe from the main supply, however as soon as our supply comes into the house it reduces immediately to 15mm.
Thanks.