Hi Guys,
I have a good handle now on skimming a wall, however i am still uncertain about the times / touch of the plaster during each stage:-
Stage 1 - 1st cost (flatten out with trowel when wall completely covered)
Stage 2 - 2nd coat ( apply when first cost is starting to set up, feels like damp sand)
Stage 3 - Dry trowel (How should the plaster feel before this stage?)
Stage 4 - Wet Trowel (How should the plaster feel before this stage?)
Stage 5 - Wet trowel (How should the plaster feel before this stage?)
Stage 6 - Dry trowel (How should the plaster feel before this stage?)
Any advice would be great, cheers guys.
I have a good handle now on skimming a wall, however i am still uncertain about the times / touch of the plaster during each stage:-
Stage 1 - 1st cost (flatten out with trowel when wall completely covered)
Stage 2 - 2nd coat ( apply when first cost is starting to set up, feels like damp sand)
Stage 3 - Dry trowel (How should the plaster feel before this stage?)
Stage 4 - Wet Trowel (How should the plaster feel before this stage?)
Stage 5 - Wet trowel (How should the plaster feel before this stage?)
Stage 6 - Dry trowel (How should the plaster feel before this stage?)
Any advice would be great, cheers guys.