I was asked to provide an estimate for a ground floor extension/garage conversion + kitchen refurb:
Kitchen: Supp. & install: 8 x firerated cast GU10 downlights (6 main kitchen, 2 extension) approx 4 New socket outlets where required; Switched spurs for extraction fan & hob ignition, washer + dishwasher; New cooker circuit in 6mm² and isolation switch; Mains powered battery backup heat detector. Remove/move socket outlets and spurs where required. Tidy/remove diy/non compliant wiring/jb's etc. Remove wall light.
Shower Room & Lobby: Supply & install: 7 x firerated cast GU10 downlights (5 lobby, 2 shower room) and associated switches; Timed extract fan and isolation switch
Study: Supply & install 6 x double socket outlets; 1 x fused spur for boiler; 6 x firerated cast GU10 downlights and switch.
Supply & install salus remote prog. stat for boiler.
Supply & install main equipotential bonding to incoming gas and water services
Supply & install additional Hager dual 30ma RCD protected consumer unit; 100A 2 pole henley block, 100A isolator switch; Meter tails and earthing conductor. (For new circuits as above, existing is board rewirable wylex)
The kitchen existing ceiling was removed and the rest is new build so first fix fairly straight forward, all accessories in GET plastic moulded. I estimated 4-5 days total with test & cert and £550 in materials, total at around 1650 (not vat reg).
Builder has said not even close, way out. What you think ?
Kitchen: Supp. & install: 8 x firerated cast GU10 downlights (6 main kitchen, 2 extension) approx 4 New socket outlets where required; Switched spurs for extraction fan & hob ignition, washer + dishwasher; New cooker circuit in 6mm² and isolation switch; Mains powered battery backup heat detector. Remove/move socket outlets and spurs where required. Tidy/remove diy/non compliant wiring/jb's etc. Remove wall light.
Shower Room & Lobby: Supply & install: 7 x firerated cast GU10 downlights (5 lobby, 2 shower room) and associated switches; Timed extract fan and isolation switch
Study: Supply & install 6 x double socket outlets; 1 x fused spur for boiler; 6 x firerated cast GU10 downlights and switch.
Supply & install salus remote prog. stat for boiler.
Supply & install main equipotential bonding to incoming gas and water services
Supply & install additional Hager dual 30ma RCD protected consumer unit; 100A 2 pole henley block, 100A isolator switch; Meter tails and earthing conductor. (For new circuits as above, existing is board rewirable wylex)
The kitchen existing ceiling was removed and the rest is new build so first fix fairly straight forward, all accessories in GET plastic moulded. I estimated 4-5 days total with test & cert and £550 in materials, total at around 1650 (not vat reg).
Builder has said not even close, way out. What you think ?