Hi, about to get our toilet floor tiled. Existing floor was concrete but the builders had to dig out the drainage and the holes have been refilled with concrete - in places this was probably 15cm deep.

How long does this need to dry before laying ceramic floor tiles? Our builder seemed to think that tiles could be laid fairly quickly as they are porous, but for laminate would need a full drying out time of 1mm per day.

Our tiler said he can put a membrane down which would cost us 50 quid extra if we're not sure and don't want to wait a long time.

Any thoughts?

Thanks very much!
 
Sponsored Links
If your going by the book, 1mm a day is right. The tiles aren't usually porous, so forget that side of it.

Your tiler is also right.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top