- Joined
- 26 Aug 2016
- Messages
- 6,833
- Reaction score
- 1,011
- Country
I'm building a raised bed with concrete blocks plus a few engineering bricks with 3 holes where necessary.
The blocks are fine and use hardly any mortar as they are solid, but the engineering bricks, loads of mortar drops in the holes.
When I'm letting I'm just letting some fall in but not too much.
Is it best to avoid letting it fall in, let it fall in where it wants to, or fill the holes up?
The blocks are fine and use hardly any mortar as they are solid, but the engineering bricks, loads of mortar drops in the holes.
When I'm letting I'm just letting some fall in but not too much.
Is it best to avoid letting it fall in, let it fall in where it wants to, or fill the holes up?