Good evening good people, I have been asked to quote for installing a commercial size Ironing Press in an outbuilding which adjoins a dwelling. The press requires 3Ph&N. I would consider the outbuilding which has a door directly into the main kitchen as a domestic environment (laundry room)
There is an adequate 3Ph&N TN-C-S supply just the other side of the wall so I am thinking of installing a sub-main (tails > 3ph switch fuse >4core SWA >CU > Iron/Press)
I have in stock a 3ph CU with three pole incomer and three pole RCBO. But what about the neutral in a domestic situation? Surely it does not need to be switched? or does it?