Hi
My first ever DIY job & I decided that tiling was a good place to start....eeek
I've done most of the work before finding this site unfortunately, because there's a lot of good advice here!
There were tiles above the bath but not high enough for the shower's spray & so I've put up more tiles to reach higher up on the side. I've grouted & it all looks pretty. Now some posts mention sealing the grout & some don't. My grout bag doesn't mentioned sealant, does that mean that I don't need it, or would they not necessarily tell me?
Also, I had to get flexible grout which doesn't mention being anti-mould. So does this mean that it isn't protected or are they all anti mould these days? It's not a pre mix grout, the powder bag is called MAPEI.
Finally, I also had quite a big gap in the corner which I stuffed a lot of grout into (I now realise sealant may have been better instead, too late, although my grout does say that it's suitable for up to 6mm gaps) & am planning on putting sealant over it, running down the length of the corner. Should I give this more than 24 hours drying time, given that it's an extra deep area of grouting, as opposed to all the thin lines between all the tiles?
Actually one more, what is the difference between drying & curing?!
Thanks in advance for any advice!
My first ever DIY job & I decided that tiling was a good place to start....eeek
I've done most of the work before finding this site unfortunately, because there's a lot of good advice here!
There were tiles above the bath but not high enough for the shower's spray & so I've put up more tiles to reach higher up on the side. I've grouted & it all looks pretty. Now some posts mention sealing the grout & some don't. My grout bag doesn't mentioned sealant, does that mean that I don't need it, or would they not necessarily tell me?
Also, I had to get flexible grout which doesn't mention being anti-mould. So does this mean that it isn't protected or are they all anti mould these days? It's not a pre mix grout, the powder bag is called MAPEI.
Finally, I also had quite a big gap in the corner which I stuffed a lot of grout into (I now realise sealant may have been better instead, too late, although my grout does say that it's suitable for up to 6mm gaps) & am planning on putting sealant over it, running down the length of the corner. Should I give this more than 24 hours drying time, given that it's an extra deep area of grouting, as opposed to all the thin lines between all the tiles?
Actually one more, what is the difference between drying & curing?!
Thanks in advance for any advice!