hi all-im in process of tiling my floor in my bathroom which was originally floorboard upstairs to which ive totally cleaned up and laid 18mmm hardboard ply over the top of the origina floorboards.
im also laying underfloor hetaing(electric mat type) over the ply-
im just after best process to do this in stages as ive bougt flexible adhesive.
is it best to lay thermal board down first or is it ok to lay electric mat firstly onto ply or is it best first putting down a screed directly onto the ply then underfloor heating on top.
is it best to pva first.
step by step instructions would be best.
thanx don
im also laying underfloor hetaing(electric mat type) over the ply-
im just after best process to do this in stages as ive bougt flexible adhesive.
is it best to lay thermal board down first or is it ok to lay electric mat firstly onto ply or is it best first putting down a screed directly onto the ply then underfloor heating on top.
is it best to pva first.
step by step instructions would be best.
thanx don