C
carlosfandango1976
Hi, searched for other posts on this topic, but the only relevant one ended in tears, and really didn't answer the question
Basically,I have my finished screeded floor with water UFH installed already and wondered whether to tile before or after the kitchen units were fitted? I'm not bothered about the "what happens if you change your units" argument, because if I change the units I'll undoubtedly be changing the floor anyway, plus I haven't bought enough tiles to tile the whole kitchen, as what's the point of tiling under units?
Any advice would be appreciated.
Thanks
Carlos
Basically,I have my finished screeded floor with water UFH installed already and wondered whether to tile before or after the kitchen units were fitted? I'm not bothered about the "what happens if you change your units" argument, because if I change the units I'll undoubtedly be changing the floor anyway, plus I haven't bought enough tiles to tile the whole kitchen, as what's the point of tiling under units?
Any advice would be appreciated.
Thanks
Carlos