Hello All
I have had my kitchen floor prepared for tiling by my builders who have now left the job unfinished so am planning to complete the job myself
the floor (approx 30 sq metres) is half cement, and half floorboards covered over with 12mm plywood. where the two materials meet the ply seems to move a bit when it is walked on also i would say the floor is far from level I am planning to level the floor with a leveling compound on the cement side and was wondering what i could do to stop the ply from bouncing where it meets the cement
Also would I need to use a different tiling adhesive for the 2 different surfaces
any advice would be greatly appreciated
I have had my kitchen floor prepared for tiling by my builders who have now left the job unfinished so am planning to complete the job myself
the floor (approx 30 sq metres) is half cement, and half floorboards covered over with 12mm plywood. where the two materials meet the ply seems to move a bit when it is walked on also i would say the floor is far from level I am planning to level the floor with a leveling compound on the cement side and was wondering what i could do to stop the ply from bouncing where it meets the cement
Also would I need to use a different tiling adhesive for the 2 different surfaces
any advice would be greatly appreciated