Hi All, i completed a extension last year and was talked into having a patio with porcelian tiles. We've layed the concrete base last year but have yet to tile. I've been told to screed the base first and tile on top of that. I've allowed for a 50mm screed.
Question: Should we lay a liquid dpm before we screed? With this being a outside patio, do i have to keep the screed dry and allow it to dry out for 2/4 weeks?
Thanks rob