Has anyone ever come across a TN-C-S installation where the main earthing connection is to the service main sheath before the cutout.
The installation looks like a classic TN-S arrangement and I would have assumed it was TN-S if it had not been for discovering a 15th ed. installation certificate from the REC behind the meter. It indicated TN-C-S with the word SHEATH in the comments box.
I've contacted the REC for clarification but in the meantime I though I'd ask the forum.
Has anyone seen this before - or is the cert wrong. (I'm sure the certificate relates to the installation I'm seeing. There is no earth from the neutral side of the cutout. I'd guess the cutout/cable predates the meter/installation).
BN
The installation looks like a classic TN-S arrangement and I would have assumed it was TN-S if it had not been for discovering a 15th ed. installation certificate from the REC behind the meter. It indicated TN-C-S with the word SHEATH in the comments box.
I've contacted the REC for clarification but in the meantime I though I'd ask the forum.
Has anyone seen this before - or is the cert wrong. (I'm sure the certificate relates to the installation I'm seeing. There is no earth from the neutral side of the cutout. I'd guess the cutout/cable predates the meter/installation).
BN