I'm trying to install a close coupled toilet in a cloakroom but the soil pipe runs vertically up from the concrete floor. It's 200mm from the back wall!When I push the toilet up as far as it will go, it's still 100mm from the back wall. Is there a solution to this problem? i've tried the multiqwik's that are '?' shape.