Hi everyone, I hope someone can help as I'm going around in circles
We have an old Wickes upvc conservatory (part brick/glass), with polycarbonate roofing. It's about 9sqm. No heating inside.
The conservatory is attached to the house, and the house patio doors have been temporarily taken off (and used for a shed!)
I want to swap this for a solid roof using lightweight tiles, I'll be doing the build.
From what little I understand, if the patio doors were re-attached, I wouldn't need building regs for the roof, however, if the doors are left off, do I need building regs as it's now part of the house? (which makes total sense) and what is the process?
Could someone clarify?
Many thanks!
[posted here, but unable to delete: https://www.diynot.com/diy/threads/trying-to-understand-building-regs-control-solid-roof.635473/]
We have an old Wickes upvc conservatory (part brick/glass), with polycarbonate roofing. It's about 9sqm. No heating inside.
The conservatory is attached to the house, and the house patio doors have been temporarily taken off (and used for a shed!)
I want to swap this for a solid roof using lightweight tiles, I'll be doing the build.
From what little I understand, if the patio doors were re-attached, I wouldn't need building regs for the roof, however, if the doors are left off, do I need building regs as it's now part of the house? (which makes total sense) and what is the process?
Could someone clarify?
Many thanks!
[posted here, but unable to delete: https://www.diynot.com/diy/threads/trying-to-understand-building-regs-control-solid-roof.635473/]