Hi All,
I hope someone can advise me on a twinwall Flue install I am doing on my bungalow.
I will be getting the Building Control guy in to approve the work before I start but would like to have an idea as to
what he would expect to see done. I am looking to install a Woodburning Stove in a downstairs room and want to
route the flue internally up through the Ceiling, into the eaves space and out the roof.
I have limited clearance to the left hand rafter as you can see below:
So I propose to cut this rafter and install trimmers to support the structure. I am limited on access (it's a 1m x1m eaves crawl space) so
can't get to the top purlin but could go lower down on the wallplate and 'birdsmouth' the trimmer onto that if necessary.
The timbers are 2"x4" and I would be using structural screws and PVA to connect the trimmers.
I have drawn out a couple of options and wonder if one of the roofing guru's here could comment or perhaps suggest a better option.
If I move the flue as far right as I can I could probably get away with this as clearance,
I can't get up to the purlin but could extend the trimmer down to the wallboard for extra support if necessary. Do you think this would satisfy the BCO?
If not another option perhaps?
As my bungalow is mostly flat roofed this structure is only supporting a side roof so no great weight on it,
I just would like to know if I would be OK to cut out the middle rafter prior to getting in the trimmers (if I went with the below option)
or am i better to extend the left and right hand most trimmers to the wallboard, before I cut out the middle rafter and then add the top and bottom and extra inside vertical trimmers after?
Hope this all makes some sense.
Many thanks, Gerry.
I hope someone can advise me on a twinwall Flue install I am doing on my bungalow.
I will be getting the Building Control guy in to approve the work before I start but would like to have an idea as to
what he would expect to see done. I am looking to install a Woodburning Stove in a downstairs room and want to
route the flue internally up through the Ceiling, into the eaves space and out the roof.
I have limited clearance to the left hand rafter as you can see below:
So I propose to cut this rafter and install trimmers to support the structure. I am limited on access (it's a 1m x1m eaves crawl space) so
can't get to the top purlin but could go lower down on the wallplate and 'birdsmouth' the trimmer onto that if necessary.
The timbers are 2"x4" and I would be using structural screws and PVA to connect the trimmers.
I have drawn out a couple of options and wonder if one of the roofing guru's here could comment or perhaps suggest a better option.
If I move the flue as far right as I can I could probably get away with this as clearance,
I can't get up to the purlin but could extend the trimmer down to the wallboard for extra support if necessary. Do you think this would satisfy the BCO?
If not another option perhaps?
As my bungalow is mostly flat roofed this structure is only supporting a side roof so no great weight on it,
I just would like to know if I would be OK to cut out the middle rafter prior to getting in the trimmers (if I went with the below option)
or am i better to extend the left and right hand most trimmers to the wallboard, before I cut out the middle rafter and then add the top and bottom and extra inside vertical trimmers after?
Hope this all makes some sense.
Many thanks, Gerry.