After a year with no toilet upstairs we decided we had enough of it so here we go .
Floor lifted and new pipe installed
Pipes connected to the loft where the boiler is .
While doing a bathroom we thought it would be a good idea to build the wardrobe and the toilet at the same time using a combination of metal studs /wood and plasterboard.
Partition wall for toilet
Shelving
Hardieback on the floor and toilet positioned but not yet connected.
Door installed
I hope to start the finishing touches over the weekend and hopefully fit the sliding door on the wardrobe . I will post more pictures on Toilet one once is updated.
Floor lifted and new pipe installed
Pipes connected to the loft where the boiler is .
While doing a bathroom we thought it would be a good idea to build the wardrobe and the toilet at the same time using a combination of metal studs /wood and plasterboard.
Partition wall for toilet
Shelving
Hardieback on the floor and toilet positioned but not yet connected.
Door installed
I hope to start the finishing touches over the weekend and hopefully fit the sliding door on the wardrobe . I will post more pictures on Toilet one once is updated.