Hi everyone
A friend has had a floor screeded over a wet UFH system. It is a sand/cement one.
The screeder said leave it of until the weekend but I've seen a month or so ?
I would have thought the warmth from it could crack it that soon?
So what is the ideal time that it should be left without the pipes turned on ?
The screed is 50mm deep
Thanks