Were about to lay our insulation boards down 100mm pir boards this is being laid on top of the oversite. Some of the oversite isnt 100% level only 10mm out max in places do we level the ground with a layer of sand before putting the boards down? Or do we just lay the boards down and foam them down to the oversite?