Underfloor heating and insulation

Joined
14 Nov 2011
Messages
75
Reaction score
3
Location
Essex
Country
United Kingdom
Were about to lay our insulation boards down 100mm pir boards this is being laid on top of the oversite. Some of the oversite isnt 100% level only 10mm out max in places do we level the ground with a layer of sand before putting the boards down? Or do we just lay the boards down and foam them down to the oversite?
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top