I live in a grade 2 listed cottage in burnley. Had it over 3 years and well..taking my time to finish it
Main job at the moment is the underfloor heating downstairs.. all the flags had to come up, then i dug out 8 tonne of earth by hand ( kitchne had concrete actually which i had to break up) and into the skip.
On sunday finally got the pips connected and running after levelling the floor and laying isulation etc etc
Now i just need 100mm of screed or so..cba doing it myself as just want it sorting. Now ive had a guy round who says it will be £400 for the front room and £300 for the kitchen..anyone out there know their prices?
Just wana make sure its a fair enough price, i know for the front their will be at least 4 tonne of screed then labour..and a bit less for kitchen as smaller etc.. any screeders on here?
cheers. dan
Main job at the moment is the underfloor heating downstairs.. all the flags had to come up, then i dug out 8 tonne of earth by hand ( kitchne had concrete actually which i had to break up) and into the skip.
On sunday finally got the pips connected and running after levelling the floor and laying isulation etc etc
Now i just need 100mm of screed or so..cba doing it myself as just want it sorting. Now ive had a guy round who says it will be £400 for the front room and £300 for the kitchen..anyone out there know their prices?
Just wana make sure its a fair enough price, i know for the front their will be at least 4 tonne of screed then labour..and a bit less for kitchen as smaller etc.. any screeders on here?