Hi all,
I was under the impression and indeed everywhere I have looked that under a block and beam floor a weed membrain is required along with a layer of hardcore or shingle etc. On my plans I have received it has a small note saying "50 concrete oversite" and pointing to the ground under the beams.
First of all what is concrete oversite and second of all is this needed on the ground below the floor rather than a membraini and some shingle/hardcore?
Thanks in advance