Hi there,
Recently I've done tiling, and due to uneven walls I've been left with 15mm gap from tiles (15mm plaster to back of a tile)
I haven't tiled whole walls, just 1,3m high.
From 1.3m I wanted to have a painted walls.
The wall is finished with multi finish finishing plaster.
What should I do to build it up, and level the wall with plastic trim on tiles?
I know I cannot use any other plaster on the top of existing plaster,
Is the only one solution is to knock the wall down and replaster it?
Or use plasterboard?
If yes, backing plaster plus mulifinish would give me in total only 15mm, and If I knocked down existing plaster then I would still have about 12mm gap between plastic tile trim and finishing plaster.
Would be great if you could help me with this matter.
Recently I've done tiling, and due to uneven walls I've been left with 15mm gap from tiles (15mm plaster to back of a tile)
I haven't tiled whole walls, just 1,3m high.
From 1.3m I wanted to have a painted walls.
The wall is finished with multi finish finishing plaster.
What should I do to build it up, and level the wall with plastic trim on tiles?
I know I cannot use any other plaster on the top of existing plaster,
Is the only one solution is to knock the wall down and replaster it?
Or use plasterboard?
If yes, backing plaster plus mulifinish would give me in total only 15mm, and If I knocked down existing plaster then I would still have about 12mm gap between plastic tile trim and finishing plaster.
Would be great if you could help me with this matter.