We are planning on having an extension built which will be a utility room, extra bedroom and a en suite
We currently have a green star i24 System boiler with 11 x radiators (some smaller than others) and a 117 litre hot water tank.
The plumber is recommending we consider upgrading the heating to have a larger tank and a pressurised System, reason being the current setup may struggle with the additional demand.
I would say it’s a cold house and the boiler struggled now, he said it may need a power flush.
Just wondering if this sounds right, he’s proposing a 226 litre tank and upgrading the pumps and valves
How long would something like this take, is it a couple of days labour plus materials?
Thanks
We are planning on having an extension built which will be a utility room, extra bedroom and a en suite
We currently have a green star i24 System boiler with 11 x radiators (some smaller than others) and a 117 litre hot water tank.
The plumber is recommending we consider upgrading the heating to have a larger tank and a pressurised System, reason being the current setup may struggle with the additional demand.
I would say it’s a cold house and the boiler struggled now, he said it may need a power flush.
Just wondering if this sounds right, he’s proposing a 226 litre tank and upgrading the pumps and valves
How long would something like this take, is it a couple of days labour plus materials?
Thanks