had scottish power guy round today to give me a quote for upgrading incoming supply . i was quoted £2000 if i did trench to transformer 100m away and £5000 if they do whole job .
im sticking with my 60A supply just need to interlock shower and heating so they are not on at same time .
he also pointed out there is no earth incoming to fuseboard will need to investigate fully at weekend
im sticking with my 60A supply just need to interlock shower and heating so they are not on at same time .
he also pointed out there is no earth incoming to fuseboard will need to investigate fully at weekend