Just upgarded main bonding from MET to CU and installed bonding to gas from MET. The Water obviously may need bonding but the problem is the stop cock is enclosed behind tiles in a cloakroom with only tap stuck out. there's no way of seeing or testing if the pipes are copper or plastic. Hoseholder thinks there are plastic, but under sink, different part of house there are copper. Any suggestions?
Is it ok to fill in a MWC for work done and state on it that access to water stop cock is inaccessible and requires further investigation? Would this be acceptable to the regs?
Is it ok to fill in a MWC for work done and state on it that access to water stop cock is inaccessible and requires further investigation? Would this be acceptable to the regs?