From responses so far, it looks like my current flow of 20l/min may not be sufficient for an unvented system to supply 5 showers (not all on at the same time). The current system is a vented hot water cylinder, with a pump to boost water to showers. Cold feed is currently provided by tanks in the loft, which need to be decomissioned to make space for a roof extension.
Here is a rough flow diagram of the current system:
This is what I am proposing (cold fed from mains)
Would this system work, bearing in mind the mains feed will be providing water to both boiler and cold taps? I appreciate there may be pressure differences.
Thanks