Hi all
I’m planning to Krend a wall soon. I’ve bought the base coat, top coat and SBR primer as advised by the local trade merchant. I’ve forgotten the advice he gave to me about when to apply the primer - he said something about not letting it dry as it goes like varnish?
Did he mean
- apply the primer to the base coat before the base coat dries? or
- apply the primer and then the top coat before the primer dries?
thoughts welcome for an enthusiastic DIYer not a plasterer
thanks
I’m planning to Krend a wall soon. I’ve bought the base coat, top coat and SBR primer as advised by the local trade merchant. I’ve forgotten the advice he gave to me about when to apply the primer - he said something about not letting it dry as it goes like varnish?
Did he mean
- apply the primer to the base coat before the base coat dries? or
- apply the primer and then the top coat before the primer dries?
thoughts welcome for an enthusiastic DIYer not a plasterer
thanks