I bought a Vokera SE28 in November 2007 and I had to get an engineer to it recently because of a fault. Apparently the type I have has a combined ignition board & pcb board and was a hybrid style.
Vokera are advising that this part is no longer made and I will have to replace it with 2 separate boards which will cost almost as much as I paid for the boiler itself.
Can anyone advise of the legal requirements for boiler manufacturers to guarantee part availability? Is there a set period for this after they stop manufacturing the boiler?
Vokera are advising that this part is no longer made and I will have to replace it with 2 separate boards which will cost almost as much as I paid for the boiler itself.
Can anyone advise of the legal requirements for boiler manufacturers to guarantee part availability? Is there a set period for this after they stop manufacturing the boiler?