can anyone tell me please what the specifications are for the intstallation of a heating system under this grant scheme .
I am eligble-as disabled - but hestitant to apply because my central heating system is old---though patched!, It is a single pipe -open vented, no return system.
I have been told that if the boiler was replaced I would need all new radiators too, and they must be placed on internal walls -not under the window as I currently have -because of doors and fitted furniture.
Also that I should have to have the new boiler in the kitchen,on the wall, not in the hall or under the stairs, and that all the pipes would be left exposed down the walls. And that the current cold water and hot tanks must be taken out too.
Can any one advise me please what the current situation is, and how to find what the spec. is
I am eligble-as disabled - but hestitant to apply because my central heating system is old---though patched!, It is a single pipe -open vented, no return system.
I have been told that if the boiler was replaced I would need all new radiators too, and they must be placed on internal walls -not under the window as I currently have -because of doors and fitted furniture.
Also that I should have to have the new boiler in the kitchen,on the wall, not in the hall or under the stairs, and that all the pipes would be left exposed down the walls. And that the current cold water and hot tanks must be taken out too.
Can any one advise me please what the current situation is, and how to find what the spec. is