We have coping stones running up the edge of the roof, up to the ridge tiles. I've had aother look, and these do overlap by a couple of inches. They have been repointed inbetween each stone, and also along the inside edge running up to the the top.
The pointing doesn't appear too bad, other than the missing bit. The main problem is that the missing pointing is right above a small extension, so theres no way I can get a ladder to it. I may have to get a professional in!!! I want to make sure I know what he needs to be doing, so all the comments above have been most appreciated. You're right, I'm only a novice, but this is a really useful site. Thanks again. When we get a bit of dry weather, I'm going to get the pointing done, and waterseal it as well.