I plan to pour my footings next week and run a new water feed from the meter to the house at the same time. The most direct route will result in it running through the footing. Te plan was to lay a 110 waste pipe in the ground the full distance as a duct to ease any potential future replacement. Is there any reason why having a pipe run across a footing would be an issue for the BCO when they inspect the trench?