Hi
I'm about to install a close coupled WC. The pan will connect to the soil spigot in the concrete floor using a 90 degree connector. I believe the connector seals into the soil pipe spigot using the rubber gaskets
How do I fill in above the top of the gasket to fill in the space between the connector and the edge of the spigot? I've seen mentioned a wax ring. Or can I just cement over the connector/spigot join?
Would appreciate replies
Thanks
CC
I'm about to install a close coupled WC. The pan will connect to the soil spigot in the concrete floor using a 90 degree connector. I believe the connector seals into the soil pipe spigot using the rubber gaskets
How do I fill in above the top of the gasket to fill in the space between the connector and the edge of the spigot? I've seen mentioned a wax ring. Or can I just cement over the connector/spigot join?
Would appreciate replies
Thanks
CC