Hello
So I wanted to patch up my drive way up. The driveway is made of tarmac. However around the edges we had to break up the Tarmac and remove it.
So I was left with a big gap outside my front door. I decided to buy the coldlay tarmac from my local DIY store.
It's not particularly cheap stuff either. I laied the tarmac and used a big metal mallet thing to compress it the best I could.
How six months later weeds are growing through it
Should I have put some kind of membrane down?
Cheers
Paul
So I wanted to patch up my drive way up. The driveway is made of tarmac. However around the edges we had to break up the Tarmac and remove it.
So I was left with a big gap outside my front door. I decided to buy the coldlay tarmac from my local DIY store.
It's not particularly cheap stuff either. I laied the tarmac and used a big metal mallet thing to compress it the best I could.
How six months later weeds are growing through it
Should I have put some kind of membrane down?
Cheers
Paul