Evening all
I'll be installing a wet ufh system, my plumber who will comission etc, recommended polypipe's system.
When I spoke the PP's tech support I've been recommend the floor panel system.
Decided to go this route and also using their ZRU regulation unit.
This is going a single room, ground floor, around 27m²
Question I have is to do with pipe centres.
PP have specified 200mm centres... does this mean 200mm between each flow pipe or 200mm between the flow pipes, then sit the return 100mm from the flow.
Also been advised to use serpentine (snail) layout, and not meander.
They have produced some heat loss figures and pipe lengths, but no diagram, as they don't... normally!
I'll be installing a wet ufh system, my plumber who will comission etc, recommended polypipe's system.
When I spoke the PP's tech support I've been recommend the floor panel system.
Decided to go this route and also using their ZRU regulation unit.
This is going a single room, ground floor, around 27m²
Question I have is to do with pipe centres.
PP have specified 200mm centres... does this mean 200mm between each flow pipe or 200mm between the flow pipes, then sit the return 100mm from the flow.
Also been advised to use serpentine (snail) layout, and not meander.
They have produced some heat loss figures and pipe lengths, but no diagram, as they don't... normally!