Hi all,
Builder has set padstones tight up under the steel, it's been 3-4 days and where it's dried out the padstone now has a gap between the steel and the pad of about 1mm or so, what's the best mix to be using to get this set back right without it dropping.
Thanks
Builder has set padstones tight up under the steel, it's been 3-4 days and where it's dried out the padstone now has a gap between the steel and the pad of about 1mm or so, what's the best mix to be using to get this set back right without it dropping.