diy to trade standard tends to meant 2 to 2.5 times as long to do the job but to the standardYou should be able to lay both rooms in a day, and then half a day for the mouldings to cover the gap, so what do you want for a day and a halfs wages. And if you manage to do it quicker, then give them a rebate, and if it takes longer, then swallow it.
Make sure you've got good knee pads.
mate could be a heI'd do it for a blowy as long as she doesn't tell your missus.
Can you come and lay my floor?And if you manage to do it quicker, then give them a rebate, and if it takes longer, then swallow it.
Make sure you've got good knee pads.
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local