Hi, the following works are to be carried out on a 5 bed Victorian terraced house in London.
1) To supply and fit new Worcester Bosch condensing boiler and reposition to first floor from ground floor
2) To supply and fit new larger capacity pre-lagged hot water cylinder and controls
3) To reposition existing neg head pump and reposition pipework to roof area
4) To power lush existing heating system
5) To supply and fit new water storage tanks to roof space
6) To run new gas supply to boiler and increase size of pipework
7) To supply and fit one new stock radiator and valve to second floor bedroom
Thank you
1) To supply and fit new Worcester Bosch condensing boiler and reposition to first floor from ground floor
2) To supply and fit new larger capacity pre-lagged hot water cylinder and controls
3) To reposition existing neg head pump and reposition pipework to roof area
4) To power lush existing heating system
5) To supply and fit new water storage tanks to roof space
6) To run new gas supply to boiler and increase size of pipework
7) To supply and fit one new stock radiator and valve to second floor bedroom
Thank you