Hi, just trying to plan ahead before pour slab. Could someone please help with the following:

1. What is the 'average' flooring depth allowed for when marking final floor level? We don't want any steps out of the bi-fold doors/utility door but have not chosen flooring yet. Kitchen likely to be engineered timber, utility tiled. I've been googling and it seems timber flooring comes in 12-22mm quite a range.
Would you leave a 15 or 20mm space after screed?

2. Is it possible to install UFH & screed in a garage which will initially be used to park car im worried about the weight of a car on the pipes? But may want to convert the garage in future so trying to be prepared now.

Thanks in advance
 
Sponsored Links
Should have said, floor will be made up of concrete slab, 100mm celotex, vapour barrier, UFH, 50mm liquid screed. Trying to determine how much depth to leave after screed for floor finish to make sure there's no threshold at the doors
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top