Hi
I have recently moved into a Victorian House built around 1900. The house is in need of complete renovation and I am now ready to start the Kitchen.
The Kitchen itself is Appox 5m x 3m with doors either end. One coming from the hallway and the other leading out through to the Garden.
originally their must have been a fully Suspended floor but now Its 2/3 Suspend starting from the Hallway entrance and working its way back with the remaining 1/3 being of concrete construction. I suspect the old joists may have rotted and this is how it was repaired.
Currently the Concrete side is starting to crack at the join and is not level with suspend floor. About 5mm higher.
There is also piping and Electric cabling under the suspended floor and a hot water cylinder in the corner of the room next to the Hallway entrance.
My my first job will be stripping out the kitchen and making the floor ready for tiling.
As far as I can tell I have three options: 1: Dig out the concrete floor and reinstate the suspended floor, 2: Rip out the suspend floor and make one of concrete construction or 3: repair the concrete cracks and lay down some sort of boarding.
I was originally going to rip up the suspended floor and lay a concrete one but my main worry there is the piping and electric cables and the more I think about it the more I think that option 3 would be less hastle and cheaper.
So has anyone got any advice on what I should do? Thanks.
I have recently moved into a Victorian House built around 1900. The house is in need of complete renovation and I am now ready to start the Kitchen.
The Kitchen itself is Appox 5m x 3m with doors either end. One coming from the hallway and the other leading out through to the Garden.
originally their must have been a fully Suspended floor but now Its 2/3 Suspend starting from the Hallway entrance and working its way back with the remaining 1/3 being of concrete construction. I suspect the old joists may have rotted and this is how it was repaired.
Currently the Concrete side is starting to crack at the join and is not level with suspend floor. About 5mm higher.
There is also piping and Electric cabling under the suspended floor and a hot water cylinder in the corner of the room next to the Hallway entrance.
My my first job will be stripping out the kitchen and making the floor ready for tiling.
As far as I can tell I have three options: 1: Dig out the concrete floor and reinstate the suspended floor, 2: Rip out the suspend floor and make one of concrete construction or 3: repair the concrete cracks and lay down some sort of boarding.
I was originally going to rip up the suspended floor and lay a concrete one but my main worry there is the piping and electric cables and the more I think about it the more I think that option 3 would be less hastle and cheaper.
So has anyone got any advice on what I should do? Thanks.